The works executed the 2nd Campaign on 2017 were completed with the following main items :
- Cathodic Protection Anode Pod Installation with Commissioning at 29 Platform location
- Pipeline Leaks Repair with subsea clamp at 3 leaks location
- Riser & Pipeline Sectional Replacement Project for 8inch MGL riser & pipeline
- Detail Engineering, Installation Engineering and Material Handling support for 6inch MGL Flexible Pipe complete with Flexible Pipe Reel Drive and Tensioner Equipment